BidLight Construction Brain: Construction Coordination and Cost Control for Mission-Critical Delivery

R
Publishes from RevitExports straight from the model
N
Publishes from NavisworksStraight from the federated model
Every export, versionedElement-level diffs between revisions
A 6am daily digestThe issues you own, every morning

Trusted on mission-critical work

Owners, general contractors and specialty trades coordinate on the same record.

Microsoft
Amazon
Google
Tesla
SpaceX
DP Electric
Walsh Group
Clayco
Skanska
Kiewit
Meade
Gaylor Electric
Triangle Electric
Chasse Building Team
Fountain Electric

Coordination is still working blind

Nothing on a project keeps a record of who changed what. These six questions go unanswered every week, and each one costs money.

Who changed what?

Someone moves a duct, and the coordination meeting spends two hours finding out who.

Who's behind?

The slip surfaces at the general contractor's meeting, three weeks late.

Where are the issues?

They are scattered across Teams, email and Bluebeam.

What changed between exports?

Teams compare PDFs side by side.

What is the delay costing?

Idle field labour costs $15K to $50K a week for each unresolved clash.

Why are field and office out of step?

Redlines and RFI answers never make it back into the model.

$1.8T
Global losses from delays and rework
9/10
Projects overrun their schedule
15-30%
Coordination and cost overruns
When nobody can see who changed what, nobody can be held to it.

One brain. Every signal on the project.

Revit and Navisworks exports, ACC / Forma models, field markups, RFIs, drone shots, meeting minutes and imported schedules flow into one record. Decisions come out of it.

Coordination dashboard with the project plan and Gantt chart

A schedule that chases its own work

One coordination programme as a Gantt chart, with milestones, per-task issue counts and health. Each morning at 6am, every person is mailed the issues they own and any plan item due within three days that still has something open.

Plan with per-task issue counts and health

Stop reconstructing what changed

Compare any two revisions and see what was added, removed, modified and unchanged, by category. A typical 90-minute coordination meeting drops to about 15 minutes.

Issue table with status, priority and responsible party

Clash to closed, with proof

Every issue is pinned to the element it concerns, owned by a trade, and gated until the fix is proven in the model.

Team intelligence with a score per contributor

See who is behind while there is time to act

Exports, issues and resolution times roll up into a score per contributor, and each person’s tasks are flagged as ahead, on track or behind.

What teams say

Sr. Project Manager, DP Electric

“BidLight managed our issues, controlled our cost and chased every block to resolution.”

Daniela DiazSr. Project Manager, DP Electric
Daniela Diaz
Meade

“Coordination on BidLight made the job easier for us in the field.”

SteveMeade
Steve
Electrical Engineer, Tesla

“On site I can see where the project actually is, instead of guessing.”

BrianElectrical Engineer, Tesla
Brian
Gaylor Electric

“I did not have to chase anyone to find out what changed.”

ChristopherGaylor Electric
Christopher
Southern Concepts Design Build

“BidLight eased me through every step of the estimating process.”

Will MooreSouthern Concepts Design Build
Will Moore

16 modules. One coordination record.

Coordination dashboard and Gantt chart

Every export, versioned.

Every publish from Revit becomes a versioned snapshot, so the project history is a record and nothing is overwritten.

  • Author, date, component count and model size on every revision
  • Element-level diffs: added, removed, modified and unchanged
  • Each changed element opened in 3D from the list of changes
  • Milestone tags and a review state: clean, needs review or watch
Issue board grouped by status

Clash to closed, with proof.

An issue can start from a 2D sheet, the 3D model or both. It closes only when the fix is proven.

  • Pinned to the model element or sheet, with its own 3D screenshot
  • Priority, discipline, author, assignee, and the revisions that raised and closed it
  • Closing needs a resolution screenshot, a tagged user and a linked model commit
  • Meeting minutes turned into tasks, issues, checklists and milestones
Plan builder with issue counts per task

Installed vs modeled, live.

The coordination plan carries its own evidence, and the field reports against the same model.

  • Gantt with milestones, imported from P6 or Microsoft Project
  • Levels, areas and systems drawn on the sheets
  • Sign-offs by both the contractor and the owner’s side
  • Elements tracked as not started, in progress or installed
Project analytics dashboard

Team intelligence and project analytics

BidLight measures who is carrying the project while there is still schedule left to act on it.

  • Contribution tracking with a daily activity heatmap
  • Problem Solver Index per team member
  • Issues opened against resolved, time to resolve and cost delta
  • Suggested actions: urgent, this week and next

Delivered where your team already works

Approve a shop drawing in BidLight and it arrives in the system your project already runs on, as a new version of the file that is already there.

Managed continuous upload to your Procore

Models and shop drawings, delivered to the Procore Documents folder you choose. Set it up once per project.

Setup guide

Upload to your ACC / Forma

Link a Revit model straight from ACC, and deliver approved shop drawings back to an ACC folder.

Setup guide

Works with what your team already uses

Publish from Revit and Navisworks, bring models in from ACC / Forma, import schedules from P6 or Microsoft Project, exchange issues as BCF, and deliver approved shop drawings to Procore as new versions of the existing files. An API is available for ERP and project-management tools.

RevitNavisworksIFCBCF exportPDF drawingsProcoreACC/FormaBIM360P6 / Microsoft Project

See it against your own project

Central Utility Plant, Phase 2, hyperscale data centre campus: 18,000+ hours saved, 8,900+ issues resolved in coordination, $12.3M cost saved, $36.9M ROI value. A demo runs on your project, not ours.

Request a DemoSee Pricing
BidLight Construction Brain

One record of the project, kept as the work happens

Every export, change, issue, sign-off and cost revision lands in the same record, tied to the person who made it.

Model export history, card view
Every export, versioned: who pushed it, when, and what changed
Split-pane element diff inspector
Added, removed, modified and unchanged elements between revisions
BIM services

Run it yourself, or have our BIM staff deliver it

BidLight's own BIM staff deliver the modeling and coordination as a service on the same system your team would use. The focus is mission-critical work: data centres, manufacturing plants and other large electrical and MEP scopes.

BIM coordination and clash resolution

You get weekly coordination with the GC and every trade partner. Clash detection and resolution handled across every trade, no exceptions. Active coordination typically runs 30 to 50 weeks: twice a week with the GC, once a week with trades.

Modeling, LOD 350-500

Modelling from design Revit files, CAD or PDF drawings: equipment, panels, conduit runs, penetrations, lighting, racks, cable tray, raceways and hangers, with RVT and NWC files issued for coordination.

2D coordinated layout drawings

Pulled straight from your signed-off 3D model: equipment and conduit types and sizing, dimensions from gridlines, vertical elevations. Typically 200-400 sheets per project.

Shop and fabrication drawings

Shop drawings per phase for field install, and manufacturing packages for prefabricated assemblies, generated from the coordinated model and reissued when it changes.

As-built modeling

Field updates. RFI responses. Vendor changes. Clash resolutions on site. All of it feeds back into the model while construction runs, on a weekly cadence with the GC and trades.

Cost moves with the model

Instant access to the real-time state of the project

Each publish from Revit becomes a versioned snapshot with its author, date, component count, model size and files, tagged by milestone. Nothing is overwritten.
Compare any two revisions: added, removed, modified and unchanged, by category. Open any changed element in 3D straight from the list.
Every issue is pinned to the element or sheet it concerns, owned by a trade, and gated until the fix is proven in the model: a resolution screenshot, a tagged sign-off and a linked model commit.
Exports, issues opened and resolved, comments and active days per person, with a Problem Solver Index. Suggestions about people are prompts for a conversation and need human review.
A project assistant that answers from the live project records, at any hour. Ask where the project stands, what an 18-day late delivery does to the timeline, who still needs to sign off, or who to call for a trade. It reads records and does not change them: any change it proposes, such as moving schedule dates, waits for your approval. It can show charts and tables with the answer and save a report as a PDF.

From BIM commit to the next decision.
Five steps from a model export to a management decision.

1. BIM commits: every export is a versioned snapshot of who pushed it, when, and what changed. 2. Cost diffs: each revision shows its dollar impact by category and by author. 3. Issue tracking: each issue is tied to a person and to the revision that raised or closed it. 4. Team intelligence: exports, issues and resolution times roll up into a score per contributor. 5. Projection: historical patterns forecast cost, open issues and schedule risk for coming revisions.

Cost databases behind the estimate

...

BidLight cost engine

Advanced platform for precise and efficient construction cost estimating.

CraftsmanBook

Craftsman book

Comprehensive resource for construction costs, labor rates, and material prices.

...

1build

Streamlines construction project estimates with accurate and detailed cost data.

...

CESK data (Coming soon)

Reliable cost estimating service with extensive construction data and insights.

...

ENR cost data (Coming soon)

Industry-standard source for current construction costs and price trends.

The estimate is read off the same model the team is coordinating. Any two revisions can be compared side by side, with cost deltas per category, trade and assembly. A category heatmap shows which costs changed across revisions, and each revision shows its total cost, the change from the previous one, the top cost driver and the user who triggered it.

The coordination workspace runs on 16 modules: Dashboard & Schedule, Sign-off timeline, Issues Manager, Contractor hours & cost, Technical documentation, Delivery health, RFI Generator, Partners, Levels Areas & Systems, Submittals, Checklists, Import documents, Find in Sheets & Model, Shop drawings, Review Center and Construction tracking.

Estimation is also a done-for-you service, with quantity takeoffs validated at 98 percent accuracy or better on manufacturing projects.

Coordination that starts inside Revit

Every export versioned, straight from Revit

The plugin publishes from the model. Each export becomes a versioned snapshot: who pushed it, when, component count and model size, tagged by milestone.

Element-level diffs between revisions

See what was added, removed, modified and unchanged between any two revisions, by category such as structural, MEP, envelope and interior. Open any changed element in 3D.

Issues pinned to Revit elements

Every issue pins to the Revit element it concerns and captures its own 3D screenshot. Owned by a trade, and tracked until someone proves it is fixed.

Cost and quantities inside Revit

Cost lines for labour, equipment, material and time, matched to the assemblies in the model, with export to Excel. Read off the same model you are coordinating.

Who uses it

General contractor BIM coordinators, subcontractor BIM teams, project executives, estimators and owners read the same record, each for a different reason.

Microsoft
Amazon
Google
Tesla
SpaceX
DP Electric
Walsh Group
Clayco
Skanska
Kiewit
Meade
Gaylor Electric
Triangle Electric
Chasse Building Team
Fountain Electric

Quantities and cost, off the coordinated model

The construction brain for mission-critical delivery -

The construction brain for mission-critical delivery -

The construction brain for mission-critical delivery -

Success Stories

See how leading architects are transforming their workflow with BidLight

5.0 Rating

“Coordination on BidLight made the job easier for us in the field. Everything we needed was in one place.”

Full electrical BIM coordination on hyperscale data centre delivery — site power, underground duct banks, manhole coordination, cable tray systems and temp power layouts, with multi-discipline clash resolution. The same coordinated model also supplied the takeoff for procurement.

View Portfolio

Electrical BIM coordination for phase 2 of a hyperscale data centre campus for a major cloud provider: site power, underground duct banks, manhole coordination, cable tray systems and temp power layouts, with multi-discipline clash resolution managed alongside Procore. The coordinated model also supplied the takeoff for procurement.

18,000+
Hours Saved
8,900+
Issues Resolved in Coordination
$12.3M
Cost Saved
$36.9M
ROI Value
BidLight's Impact

BidLight was the coordination record for the electrical scope: every model export versioned, every issue pinned to a Revit element with an auto-captured 3D screenshot, assigned by trade and tracked to resolution, and every contributor's throughput visible against the schedule. The same versioned model also supplied the takeoff for procurement.

Pricing

Priced the way you bid the work

Per project scope, a flat fee paid at milestones, or a monthly engagement - a line item that goes straight into your bid.

See pricing

Buying the software on its own? See the per-licence plans.

Get in touchLogin